Construction Update

The septic guy came out today (had a hard time starting his equipment as the fuel lines were frozen). He dug the beginnings of the trench from the current distribution tank line out to the drain field. He dropped a couple pipes in the main trench and said he'd be back on Monday to "finish the rest". He brought a big load of gravel with him, which is sitting in our yard right now where the garage will be going.