I got the shelving installed for the stereo system. I'm still waiting on an RMA number so I can send back the 2 speakers that were damaged in shipping (actually all 4 were damaged when I got them, but 2 were particularly bad).
And the proper blackout film for the windows showed up yesterday. Hopefully this weekend I'll be able to install it.
Nobody has shown up the last two days to work on the steps. Grrr.